New Studio

posted in: Comments | 0

Welp, it’s finally happening. My new woodworking studio is up and now comes the part I’m not fond of, finishing off the inside. The floor is stained and ready for sealing. Then furring channel to attach the sheet rock, run electrical (not in that order) more insulation etc. Then move all the equipment. Ug, but it will be most excellent when completed. It will have HVAC and should keep the rust to a minimum. The walls are 10 ft. so I will build storage platforms at 8 ft, that will give me 2 to 4 ft of storage for wood and equipment not used a lot. That will come last. Not sure on cabinets or rolling shelves yet. Let me know your thoughts. Ciao

Leave a Reply